The second railway line

Currently, the mine "Syderitovaya" on the horizon +480 meters pave the second line of railroad tracks.
By the end of November, a total of one hundred meters is planned to run. The work is BSHPU contractor, also engaged in mining. Contractors brought electric trolleys and ten trolleys. As with other work, it aims to increase productivity "Syderitovaya" and, in particular, to increase the capacity of the site. 
By the end of the year mine will reach the planned production of 120,000 tons.